Multispace Systems Ltd supplied three Type 110C Rw57dB movable walls and four Vinyl Concertina folding partitions.

Due to poor access to the higher levels, the partitions were forklifted to a purpose built loading platform and then manoeuvred into position. This required enhanced RAMS, Lifting Assessment and SMSTS to carry out all works safely.

The concertina partitions used a steel ‘Top Hat’ section to enable the track to be fully recessed into the suspended ceiling.