The hotel owned an old movable wall that required replacement. To avoid full removal of the ceiling we designed a track fixing detail that retained the existing track. Additionally, the new movable wall closed against a double door and reveal. We therefore manufactured one panel with a stepped leading edge that fitted into the reveal perfectly. An additional movable wall was supplied one year later.