The main contract brief was to construct new extensions and refurbish the existing building, at Moor Row in Cumbria.

As part of the scheme, a Café area was required that could open into the Reception Area as required.

Four glass movable walls were required, comprising one large fixed section, one pivot door with closer and two fully closing walls in seven panels.

The Architect selected the Multispace GS35 glazed movable wall system (Geze MSW) to screen the café area, and to provide the required flexibility.